DS2, Grangecastle

Key features include the excavation of 200,000m³ for the main building and carpark areas, ground floor and suspended floor pours for the DS2 Production Building and Link Corridor, the development of two temporary car parks to facilitate ongoing operations, and the design and installation of a ground water storage, treatment, and discharge management system.

Project Details

Client: Wills Bros

Products Used: Monarflex RMB400 11,400m2, Titanbond 1,500m2,

Sector: Pharma & Life Sciences